Handling of single-line diagrams, point-to-point wiring, lists of loads, electrical protections, parts of MCC starters, in order to verify the documentary configuration and correct selection of the rotection devices. increase Backup time whit UPS, PDP, test for TRM,
Review technical breakdown information. Of the starters installed in the cubicles of the Control Centers of 480 V motors to verify last change and adjust in the overload protection referenced on drawings. Basically Electrical Enginerring
F.M.E.A. (Failure Mode Error AnĂ¡lisis)