Modelling simulation using tecnomatix plant simulation 15

Closed Posted 2 years ago Paid on delivery
Closed Paid on delivery

Sewing tool packaging production line. Every week will send products include the stuff require to pack the sewing tools. So, I need to build a model simulation that will determine how many days products will ready to ship back the factory.

Manufacturing Engineering

Project ID: #30620675

About the project

1 proposal Remote project Active 2 years ago

1 freelancer is bidding on average $200 for this job

wtomazini13

Hi, please let me know the aspects of this project, the requirements, and if you have any documentation on what should be done. Thanks

$200 USD in 10 days
(0 Reviews)
0.0