Cancelled

Multiprocessor Scheduler

This project is about designing and simulating a clock-driven quad-processor scheduler in an object-oriented manner. The scheduler consists of a multi-level job queue where each level follows a different scheduling algorithm viz. Priority, Shortest Job First (SJF) and First-come-first-serve (FCFS). These queues will be enqueued with PCBs. The PCBs can further be classified into Recurring and non-Recurring. These PCBs are generated randomly, based on the probability data provided in an input file.

Skills: Electrical Engineering, Electronics, Engineering, Matlab and Mathematica, Verilog / VHDL

See more: multiprocessor scheduling algorithm, types of multiprocessor scheduling, multiprocessor scheduling in operating system ppt, multiprocessor scheduling problem, multiple processor scheduling in operating system pdf, multi process scheduling in operating system, multiprocessor scheduling slideshare, multiprocessor scheduling in operating system wikipedia, shortest job program arrival time, preemptive shortest job scheduling program, program shortest job, shortest job scheduling, shortest job scheduling program, write program simulate shortest job, preemptive shortest job, example shortest job scheduling java program, shortest job program, shortest job, shortest job preemptive visual basic, shortest job scheduling using visual basic

About the Employer:
( 7 reviews ) Bridgeport, United States

Project ID: #15837652

1 freelancer is bidding on average $25 for this job

$25 USD in 1 day
(46 Reviews)
5.3