Closed

Hydrology_Civil_01

1. Obtain wave historical data from nearby deep water stations (using provided links).

2. Plot wave rose and estimate design wave height (using MIKE Zero)

3. Estimate the design water level considering the storm surge, SLR , MHWS,….

4. Transform the wave to the toe of the structure (shoaling, refraction,…) using design water level and provided bathymetry information.

5. Check the breaking condition

6. Design the cross sections of the structure (armor size, filter, core, slope, crest height,... )

7. Provide the drawings (at least two cross section) and estimate the volume/cost of the required material.

8. Estimate the bypassing time

Skills: Civil Engineering, Engineering, Mechanical Engineering, Structural Engineering

See more: mysql filter time, time data filter mysql, call time information iphone, ftp server time information, scroll real time changing information, online time information server, oscommerce product information filter menu, mt4 time filter, mql4 time filter, add time filter, mt4 day time filter, metatrader time filter, heiken ashi time filter, martingale time filter, news time filter, information tablet check sheets data, time filter

About the Employer:
( 514 reviews ) KANPUR, India

Project ID: #19621152

2 freelancers are bidding on average $114 for this job

jainshashwat443

Dear Sir, I think i am good choice for you. Currently I am pursuing Btech(Civil Engineering). I have a lot of knowledge in hydrology Subject it is also my favorite subject. You can chat with me and lets get started. Th More

$100 AUD in 5 days
(0 Reviews)
0.0
$128 AUD in 10 days
(0 Reviews)
0.0