Find Jobs
Hire Freelancers

Adjust the power rating Only !!

$100-150 USD

Cancelled
Posted over 10 years ago

$100-150 USD

Paid on delivery
1) I need a complete design like the image that I attached. 2) There are 9 blocks. They are grid block, load block, inverter block, battery block, solar block wind block, fuel cell block, measurement block, control block. (Rectifier block may be added later)….. 3)I will give you all the blocks which would be designed already….you need to adjust the power rating according my requirement and make the network stable.. 4) Control system should be work like the following way….  Measure the value from the load  Measure the value from all types of generations  Calculate the power flow  Collect resulting current and voltage from load flow calculation  Supply the power generation according to the load demand. The power supply will depend according to the generation priority. The following generation will get the maximum priority (upper one will get 1st priority) for power supply. 1) Wind Power 2) Solar Cell 3) Fuel cell 4) Battery 5) Grid  When the generation is more than the demand load then calculate the surpassed production  Calculate the amount of surpassed production  Calculate the maximum discharge from the battery  Derive power flow to the Battery unit and calculate it  When the storage unit will be full charged then power flow supply to the battery unit will turned off.  Then the surpassed power will supply to the Grid During the control design, following points must be consider o Control P and Q set points for the energy hub (inverter/rectifier system) o P > 0 the inverter feeds P into the network o P < 0 the rectifier charges the battery o And similar for Q • Depending on the demand (or set point in the energy hub) o Build small PID – type controllers (or just monitors in the case of wind and PV)  Each controller will have: • P setpoint (e.g. P_setpoint_battery) – only to curtail for wind and PV • P measured (e.g. P_measured_battery) o Depending on the setpoints for the energy hub you will need to adjust the setpoints of the subsystems (like battery, fuel cell, wind and PV) connected to the DC bus. o Increase simulation to 24h scale o Simulation matches the time step of the data series. Here is the power rating...... Energy hub 100kW (with adjustable P/Q) (Inverter/Converter) Wind power 30kW Solar 30kW Battery max power output 75 kW (buck converter or charge pump) Battery max charge 60kW (buck converter or charge pump) Dump load 100kW Fuel cell 3kW Electrolyzer 4kW Load is 500 KW Grid......500 KW
Project ID: 5075190

About the project

4 proposals
Remote project
Active 10 yrs ago

Looking to make some money?

Benefits of bidding on Freelancer

Set your budget and timeframe
Get paid for your work
Outline your proposal
It's free to sign up and bid on jobs
4 freelancers are bidding on average $132 USD for this job
User Avatar
Professional simulation and control domain engineer can take of your project. I have 25 years of experience in Wind Turbine, Generator s and other load related simulations
$148 USD in 3 days
4.4 (51 reviews)
5.5
5.5
User Avatar
Hi we have good experience in this kind of load analysis,so i can help you to finish this project with in the time limit.
$138 USD in 10 days
0.0 (0 reviews)
0.0
0.0
User Avatar
A proposal has not yet been provided
$138 USD in 10 days
0.0 (0 reviews)
0.0
0.0

About the client

Flag of PAKISTAN
ISLAMABAD, Pakistan
4.4
1
Payment method verified
Member since Oct 10, 2013

Client Verification

Thanks! We’ve emailed you a link to claim your free credit.
Something went wrong while sending your email. Please try again.
Registered Users Total Jobs Posted
Freelancer ® is a registered Trademark of Freelancer Technology Pty Limited (ACN 142 189 759)
Copyright © 2024 Freelancer Technology Pty Limited (ACN 142 189 759)
Loading preview
Permission granted for Geolocation.
Your login session has expired and you have been logged out. Please log in again.