Manufacturing Engineering Jobs

Filter

My recent searches
Filter by:
Budget
to
to
to
Type
Skills
Languages
    Job State
    9 jobs found, pricing in USD

    Simulation Aided Scheduling Tool for Reconfigurable Assembly Systems The process: 1. Build the simulation in 2D. 2. Build the flow process for each product. 3. Insert average processing time (refer table) for each step. 4. Insert the number of products that arrive for each product (refer table, already highlighted). 5. Insert the working hour shift a. Shift 1: 0830 – 1230 b. Shift 2: 1330 ...

    $30 - $250
    $30 - $250
    0 bids

    Simulation Aided Scheduling Tool for Reconfigurable Assembly Systems The process: 1. Build the simulation in 2D. 2. Build the flow process for each product. 3. Insert average processing time (refer table) for each step. 4. Insert the number of products that arrive for each product (refer table, already highlighted). 5. Insert the working hour shift a. Shift 1: 0830 – 1230 b. Shift 2: 1330 ...

    $97 (Avg Bid)
    $97 Avg Bid
    4 bids

    Manufacturing Engineer Packaging SImulation Modelling simulation using tecnomatix plant simulation 15

    $30 (Avg Bid)
    $30 Avg Bid
    1 bids

    Simulation Aided Scheduling Tool for Reconfigurable Assembly Systems The process: 1. Build the simulation in 2D. 2. Build the flow process for each product. 3. Insert average processing time (refer table) for each step. 4. Insert the number of products that arrive for each product (refer table, already highlighted). 5. Insert the working hour shift a. Shift 1: 0830 – 1230 b. Shift 2: 1330 ...

    $70 (Avg Bid)
    $70 Avg Bid
    3 bids

    Simulation Aided Scheduling Tool for Reconfigurable Assembly Systems The process: 1. Build the simulation in 2D. 2. Build the flow process for each product. 3. Insert average processing time (refer table) for each step. 4. Insert the number of products that arrive for each product (refer table, already highlighted). 5. Insert the working hour shift a. Shift 1: 0830 – 1230 b. Shift 2: 1330 ...

    $155 (Avg Bid)
    $155 Avg Bid
    2 bids

    Sewing tool packaging production line. Every week will send products include the stuff require to pack the sewing tools. So, I need to build a model simulation that will determine how many days products will ready to ship back the factory.

    $30 - $250
    $30 - $250
    0 bids

    The Proposals written must include: *Research Proposal* – (2-page limit research proposal plus an additional page for references, strictly enforced): Specifically and clearly state the research question to be investigated, including your activities and goals. Also, include how your research aligns with one of the Ira A. Fulton Schools of Engineering research themes. *Bibliography* – ...

    $81 (Avg Bid)
    $81 Avg Bid
    9 bids